National Power Rodding removed 22 million gallons of water, numerous types of stranded wildlife, and 3,275 tons of accumulated sediment, from a Texas tunnel. National Power used a custom-made vehicle to perform a digital recorded Television inspection of the 26.5 diameter, 1-mile long tunnel and facilitated entry into the tunnel and visual inspections by the owner. The debris was removed from a 42-foot diameter, 26-foot deep access tunnel by numerous vacuum trucks.